Home / Roof Waterproofing Ali Baba Doner Kebab DHA Pahse 2 Islamabad
WATERPROOFING.COM.PK

Roof Waterproofing Ali Baba Doner Kebab DHA Pahse 2 Islamabad

Professional waterproofing and property protection solutions.

Roof Waterproofing Ali Baba Doner Kebab DHA Pahse 2 Islamabad

A successfully completed roof waterproofing project was carried out at Ali Baba Doner Kebab, DHA Phase 2 Islamabad by Hazir Pakistan, a professional waterproofing and construction chemical company in Pakistan. The project was published for portfolio use on https://waterproofing.com.pk/.

The restaurant was facing continuous roof leakage issues during rainfall, which was affecting interior ceilings, wall corners, and customer service areas. Immediate technical intervention was required to protect the building from further water damage.

📱 WhatsApp 👍 Facebook 📞 Call Us ▶️ YouTube
Our Expert
Qaisar Abbas - Certified Termite & Pest Control Specialist

Qaisar Abbas

Certified Roof Waterproofing and Heat Proofing Specialist

With over 12 years of professional experience in waterproofing solutions, roof leak repair, and moisture protection, Qaisar Abbas has helped thousands of homeowners, commercial property owners, and industrial clients protect their buildings from water damage across Pakistan. His expertise includes roof waterproofing, basement waterproofing, bathroom waterproofing, foundation waterproofing, polyurethane membrane applications, bituminous membrane installation, and long-lasting leak prevention systems using high-quality waterproofing chemicals and industry-approved application techniques.


Project Overview

This was a commercial roof waterproofing project for a running restaurant located in DHA Phase 2 Islamabad. The main goal was to permanently stop water seepage and protect the interior structure from rain-related damage.

Main Problems Identified:

  • Active roof leakage during rain
  • Multiple cracks in RCC slab
  • Failed old waterproofing coating
  • Water seepage in ceiling corners
  • Improper roof drainage flow
https://youtube.com/shorts/GTVoOLVSS_U

Site Inspection & Technical Analysis

Before starting work, the Hazir Pakistan technical team conducted a detailed inspection of the rooftop to identify leakage sources.

Inspection included:

  • Crack mapping on concrete surface
  • Water ponding areas
  • Drainage slope condition
  • Parapet wall joint leakage points
  • Previous coating failure zones

After analysis, a PU-based waterproofing system with fiber mesh reinforcement and multi-layer coating system was recommended for long-term durability.

Need help choosing the right waterproofing material?
Before selecting a waterproofing solution, compare the latest prices of Sika, Dr. Fixit, Fosroc, MasterSeal, Bituminous Membrane, PU Coatings, and other waterproofing chemicals available in Pakistan.

→ View Waterproofing Chemical Price in Pakistan

Waterproofing System Applied

The project was completed using a high-performance PU waterproofing system suitable for commercial rooftops exposed to heat, rain, and temperature changes.

Step 1: Surface Cleaning

Roof surface was thoroughly cleaned to remove dust, loose particles, and old weak coating material.

Step 2: Crack Repair & V-Grooving

All visible cracks were opened, cleaned, and filled with high-strength crack sealing material.

[Add Image: Crack repair and surface preparation on rooftop]

Step 3: Fiber Mesh Reinforcement

Fiber mesh was applied on cracks, joints, and parapet wall corners for extra structural strength.

Step 4: Primer Application

A strong bonding primer was applied for proper adhesion between concrete and PU coating.

Step 5: First PU Waterproof Layer

First layer of PU coating was applied evenly across the roof surface.

Step 6: Second PU Waterproof Layer

Second layer was applied after curing time to form a seamless waterproof membrane.

Step 7: Protective UV Topcoat

A UV-resistant protective coating was applied for long-term weather protection.


Project Challenges

Since the project site was an active restaurant, Hazir Pakistan ensured:

  • No disruption to restaurant operations
  • Safe working near kitchen exhaust areas
  • Fast-curing material selection for efficiency
  • Clean and controlled application process

The project was completed successfully within the planned timeframe without affecting business activity.


Final Results

After completion of the waterproofing system by Hazir Pakistan, the roof is now fully protected.

Achieved Results:

  • 100% elimination of roof leakage
  • Strong crack sealing system
  • Seamless waterproof membrane formation
  • Improved roof durability
  • Long-term rain resistance achieved
  • Protection of interior ceilings and walls

Why PU Waterproofing Was Selected

PU waterproofing was chosen because:

  • Seamless application without joints
  • High flexibility against temperature changes
  • Excellent crack-bridging performance
  • Long-lasting protection for commercial roofs
  • Suitable for complex rooftop structures

Project Location

📍 Ali Baba Doner Kebab
DHA Phase 2, Islamabad, Pakistan

🛠️ Project Executed By: Hazir Pakistan
🌐 Published On: https://waterproofing.com.pk/


Final Verdict

This project demonstrates how professional waterproofing can permanently resolve roof leakage issues when proper inspection, crack treatment, and multi-layer PU system is applied.

With expert execution by Hazir Pakistan, Ali Baba Doner Kebab rooftop is now fully protected against rainwater leakage, ensuring smooth restaurant operations without interruption.

For similar roof waterproofing projects in Islamabad, DHA, Bahria Town, and surrounding areas, visit:
👉 https://waterproofing.com.pk/

Need professional waterproofing?

Discuss your property and leakage concerns with our team.

Request a Free Quote →